Film-coated Duraplex shuttering plywood sheet in stock in Lahore

Construction

Shuttering Material in Lahore

Complete shuttering solutions for construction projects — plywood sheets, steel props, centering plates, and all accessories. Bulk supply with site delivery.

Shuttering Products

Shuttering Plywood

Call for Rate

Heavy-duty plywood designed for concrete formwork. Available in standard 8x4 feet sheets, 12mm and 18mm thickness. Film-faced option available for smooth concrete finish.

Specifications

  • 8x4 feet sheets
  • 12mm & 18mm thickness
  • Film-faced available
  • Reusable 8-12 times

Steel Props (Adjustable)

Call for Rate

Heavy-duty adjustable steel props for supporting shuttering formwork. Available in various sizes from 1.6m to 4.0m extension. Hot-dip galvanized options available.

Specifications

  • 1.6m to 4.0m range
  • Load capacity: 2-3 tons
  • Adjustable height
  • Galvanized option

Centering Plates

Call for Rate

Steel centering plates for beam and slab shuttering support. Standard sizes available with proper load distribution design.

Specifications

  • Standard sizes
  • Steel construction
  • Load distribution design
  • Reusable

Shuttering Accessories

Call for Rate

Complete range of shuttering accessories including tie rods, wing nuts, clamps, nails, and release oil for efficient formwork assembly.

Specifications

  • Tie rods & wing nuts
  • Clamps & fasteners
  • Shuttering nails
  • Release oil

Process

How Shuttering Works

Shuttering (also called formwork) is a temporary structure used to hold wet concrete in place until it hardens. The quality of shuttering material directly affects the finish and structural integrity of concrete work.

  1. 1Planning — Calculate material requirements based on slab/beam dimensions. Use our calculator for quick estimates.
  2. 2Assembly — Set up steel props at proper spacing, place centering plates, and lay shuttering plywood sheets.
  3. 3Pouring — Pour concrete onto the shuttering. Ensure even distribution and proper vibration.
  4. 4Curing & Removal — After adequate curing time (typically 7-28 days), carefully remove the shuttering for reuse.

Need Timber or Plywood?

Get today's best rates on timber, plywood, and shuttering material. Free delivery across Lahore and bulk dispatch nationwide across Pakistan.

Call Now
WhatsApp